An All Purpose Utility Tool for the Power Grid
Tackling two major concerns for utility workers—safety and time—Doble’s M7100 will revolutionize the way offline testing is done.
The M7100 automates multiple tests, previously performed by several pieces of equipment, cutting down testing time from seven hours to one and a half hours. By dramatically reducing testing time, utilities can now maximize their outage periods by performing more maintenance during the hours previously devoted to testing.
HV Power Factor/Tan-Delta
HV DC Resistance
Polarization Index
Tip-Up
HV 3 Phase 10 kV Iex
DFR
3 Phase LV TTR
3 Phase LR
3 Phase WRT
Primary Injection
Secondary Injection
Ductor
uOhm Meter & more…